Skip to content
State Compliance Reference

Virginia SWPPP Compliance

Quick Facts for Virginia

  • Authority: Virginia DEQ (VA)
  • Permit: VPDES Construction General Permit (VAR10)
  • Inspection Schedule: Every 5 business days OR 10 days + 0.25" rain
  • Rain Trigger: 0.25 inches
This page is a field reference, not legal advice. Confirm the current permit, local requirements, and project-specific conditions with Virginia DEQ before relying on a deadline or inspection schedule.

Regulation Overview

Permitting Authority

Virginia DEQ

Official Permit

VPDES Construction General Permit (VAR10)

Inspection Frequency

Every 5 business days OR 10 days + 0.25" rain

Rain Event Trigger

Inspection Requirements for Virginia

Construction projects that disturb one or more acres—or smaller sites that are part of a larger common plan—commonly require stormwater permit coverage in Virginia. Eligibility, exemptions, local approvals, and project-specific conditions vary, so confirm coverage under the VPDES Construction General Permit (VAR10) before construction begins.

Operational Insight

Use the permit-defined schedule as the baseline and document each completed inspection. Project size, receiving water, stabilization status, or local approvals may change the frequency shown here.

Specific State Nuance

Requires 'Responsible Land Disturber' (RLD) designation.

Common BMPs Checked in Virginia

Continue your field review

Check common controls in the BMP field guide, then compare them with your approved SWPPP.

Regulatory Filing

File Notice of Intent (NOI)

Agency Contact

Why Go Digital?

Handwritten logs are hard to read and easy to lose. Digital reports provide a timestamped, geo-tagged audit trail that protects your business.

"The best defense against an EPA audit is a perfect paper trail."