Stabilized Construction Entrance

A pad of aggregate underlain with filter cloth located at any point where traffic will be entering or leaving a construction site.

Inspection Checklist

  • Rock should be clean, large (3-6 inch) stone.
  • Dimensions should meet local code (typically 50ft long x 12ft wide).
  • Geotextile fabric should be visible underneath if required.
  • Entrance should flare at the connection to the paved road.

Common Failures

  • Track-out: Mud leaving the site on vehicle tires.
  • Rutting: Rocks pushed into soft soil, reducing effectiveness.
  • Sediment accumulation on the pad itself.

Maintenance & Corrections

  • 1. Top dress with additional stone when rock becomes clogged with soil.
  • 2. Sweep adjacent paved roads daily if track-out occurs.
  • 3. Ensure all traffic uses this specific entrance.
Inspection Freq: Daily visual check for track-out.