Skip to content
State Compliance Reference

Tennessee SWPPP Compliance

Quick Facts for Tennessee

  • Authority: Tennessee TDEC (TN)
  • Permit: TNR100000 Construction General Permit
  • Inspection Schedule: Twice Weekly (at least 72h apart)
  • Rain Trigger: N/A (Schedule based)
This page is a field reference, not legal advice. Confirm the current permit, local requirements, and project-specific conditions with Tennessee TDEC before relying on a deadline or inspection schedule.

Regulation Overview

Permitting Authority

Tennessee TDEC

Official Permit

TNR100000 Construction General Permit

Inspection Frequency

Twice Weekly (at least 72h apart)

Rain Event Trigger

N/A (Schedule based)
Check Missed Events

State vs. Federal (EPA)
Stricter than EPA

Twice Weekly Inspections

Inspections must be performed twice per week, at least 72 hours apart. Rain events do not trigger extra inspections if this schedule is met.

Inspection Requirements for Tennessee

Construction projects that disturb one or more acres—or smaller sites that are part of a larger common plan—commonly require stormwater permit coverage in Tennessee. Eligibility, exemptions, local approvals, and project-specific conditions vary, so confirm coverage under the TNR100000 Construction General Permit before construction begins.

Operational Insight

Build the twice-weekly requirement into the site calendar and preserve the required spacing between inspections. Check the permit for reduced-frequency provisions before changing that cadence.

Specific State Nuance

TN requires inspections TWICE a week (e.g. Tuesday/Friday). This is stricter than the standard weekly rule.

Common BMPs Checked in Tennessee

Continue your field review

Check common controls in the BMP field guide, then compare them with your approved SWPPP.

Regulatory Filing

File Notice of Intent (NOI)

Agency Contact

Why Go Digital?

Handwritten logs are hard to read and easy to lose. Digital reports provide a timestamped, geo-tagged audit trail that protects your business.

"The best defense against an EPA audit is a perfect paper trail."