North Dakota SWPPP Compliance
Quick Facts for North Dakota
- Authority: North Dakota DEQ (ND)
- Permit: NDPDES General Permit NDR10-0000
- Inspection Schedule: Every 14 days + within 24h of 0.25" rain
- Rain Trigger: 0.25 inches
Regulation Overview
Permitting Authority
Official Permit
Inspection Frequency
Rain Event Trigger
Inspection Requirements for North Dakota
Construction projects that disturb one or more acres—or smaller sites that are part of a larger common plan—commonly require stormwater permit coverage in North Dakota. Eligibility, exemptions, local approvals, and project-specific conditions vary, so confirm coverage under the NDPDES General Permit NDR10-0000 before construction begins.
Operational Insight
A 14-day schedule may be paired with an event-driven inspection requirement. Track both the recurring deadline and qualifying weather events so one schedule does not obscure the other.
Specific State Nuance
Dewatering requires specific BMPs. Frozen ground inspections can be suspended.
Common BMPs Checked in North Dakota
- Silt Fences & Perimeters
- Construction Entrances
- Concrete Washout Areas
- Inlet Protection
- Stockpile Management
- Dust Control
Continue your field review
Check common controls in the BMP field guide, then compare them with your approved SWPPP.
Regulatory Filing
Agency Contact
Official Resources
Why Go Digital?
Handwritten logs are hard to read and easy to lose. Digital reports provide a timestamped, geo-tagged audit trail that protects your business.