Skip to content
State Compliance Reference

Maine SWPPP Compliance

Quick Facts for Maine

  • Authority: Maine DEP (ME)
  • Permit: Maine Construction General Permit (MCGP)
  • Inspection Schedule: Weekly + within 24h of storm
  • Rain Trigger: 0.25 inches
This page is a field reference, not legal advice. Confirm the current permit, local requirements, and project-specific conditions with Maine DEP before relying on a deadline or inspection schedule.

Regulation Overview

Permitting Authority

Maine DEP

Official Permit

Maine Construction General Permit (MCGP)

Inspection Frequency

Weekly + within 24h of storm

Rain Event Trigger

State vs. Federal (EPA)
Stricter than EPA

Winter Stabilization

Areas not worked for >3 days must be stabilized during winter months (vs 14 days normally).

Inspection Requirements for Maine

Construction projects that disturb one or more acres—or smaller sites that are part of a larger common plan—commonly require stormwater permit coverage in Maine. Eligibility, exemptions, local approvals, and project-specific conditions vary, so confirm coverage under the Maine Construction General Permit (MCGP) before construction begins.

Operational Insight

This schedule combines recurring and event-driven duties. Record rainfall or discharge events independently from the weekly calendar and document why each event did or did not trigger an inspection.

Specific State Nuance

Winter construction rules apply Nov 1 - Apr 15. Sites must be buttoned up for snow.

Common BMPs Checked in Maine

Continue your field review

Check common controls in the BMP field guide, then compare them with your approved SWPPP.

Regulatory Filing

File Notice of Intent (NOI)

Agency Contact

Why Go Digital?

Handwritten logs are hard to read and easy to lose. Digital reports provide a timestamped, geo-tagged audit trail that protects your business.

"The best defense against an EPA audit is a perfect paper trail."