Skip to content
State Compliance Reference

Georgia SWPPP Compliance

Quick Facts for Georgia

  • Authority: Georgia EPD (GA)
  • Permit: NPDES General Permit No. GAR100000
  • Inspection Schedule: Daily (Rain Log) + Weekly (BMPs)
  • Rain Trigger: 0.5 inches
This page is a field reference, not legal advice. Confirm the current permit, local requirements, and project-specific conditions with Georgia EPD before relying on a deadline or inspection schedule.

Regulation Overview

Permitting Authority

Georgia EPD

Official Permit

NPDES General Permit No. GAR100000

Inspection Frequency

Daily (Rain Log) + Weekly (BMPs)

Rain Event Trigger

State vs. Federal (EPA)
Stricter than EPA

Daily Rain Logging

You must log rainfall data every single day, separate from the weekly inspection report.

Inspection Requirements for Georgia

Construction projects that disturb one or more acres—or smaller sites that are part of a larger common plan—commonly require stormwater permit coverage in Georgia. Eligibility, exemptions, local approvals, and project-specific conditions vary, so confirm coverage under the NPDES General Permit No. GAR100000 before construction begins.

Operational Insight

Use the permit-defined schedule as the baseline and document each completed inspection. Project size, receiving water, stabilization status, or local approvals may change the frequency shown here.

Specific State Nuance

Georgia requires daily rainfall logs even if no inspection occurs. 'Triple Sampling' protocol applies to impaired waters.

Common BMPs Checked in Georgia

Continue your field review

Check common controls in the BMP field guide, then compare them with your approved SWPPP.

Regulatory Filing

File Notice of Intent (NOI)

Agency Contact

Why Go Digital?

Handwritten logs are hard to read and easy to lose. Digital reports provide a timestamped, geo-tagged audit trail that protects your business.

"The best defense against an EPA audit is a perfect paper trail."