Sediment Basin

A temporary pond built to capture runoff from larger disturbed areas, allowing sediment to settle before discharge.

Inspection Checklist

  • Outlet structure (skimmer or riser) is free of debris.
  • Embankments are stable and not eroding.
  • Basin is not filled with sediment (>50% capacity).
  • Emergency spillway is stabilized with rock.

Common Failures

  • Short-circuiting: Inlet too close to outlet, preventing settling.
  • Clogged outlet causing excessive flooding.
  • Turbid discharge leaving the site.
  • Bank erosion.

Maintenance & Corrections

  • 1. Remove sediment when basin is 50% full.
  • 2. Clean trash racks and skimmers after every storm.
  • 3. Repair erosion on banks and stabilize immediately.
Inspection Freq: Weekly and within 24 hours of rain.