Skip to content
Erosion Control

Dust Control

Practices to reduce windborne sediment, including water application, tackifiers, and wind barriers.

Inspection Checklist

  • Visible moisture on haul roads during dry days.
  • No visible dust plumes leaving the site boundary.
  • Reduced vehicle speeds on site.

Common Failures

  • Roads drying out on weekends.
  • Excessive speed by delivery trucks.
  • Applying too much water, causing runoff and track-out.

Maintenance & Corrections

  • 1. Re-apply water or tackifier as needed based on weather.
  • 2. Install wind fences for long-term inactive piles.
Inspection Freq: Daily during dry/windy weather.

Digitize this Checklist

Stop using paper logs. RunOffTrack has a built-in, customizable checklist for Dust Control and 50+ other BMPs.

Add Photo Evidence
Draw on Site Map
Open Tool
Start Free Inspection