Erosion Control
Dust Control
Practices to reduce windborne sediment, including water application, tackifiers, and wind barriers.
Inspection Checklist
- Visible moisture on haul roads during dry days.
- No visible dust plumes leaving the site boundary.
- Reduced vehicle speeds on site.
Common Failures
- Roads drying out on weekends.
- Excessive speed by delivery trucks.
- Applying too much water, causing runoff and track-out.
Maintenance & Corrections
- 1. Re-apply water or tackifier as needed based on weather.
- 2. Install wind fences for long-term inactive piles.
Inspection Freq: Daily during dry/windy weather.
Digitize this Checklist
Stop using paper logs. RunOffTrack has a built-in, customizable checklist for Dust Control and 50+ other BMPs.
Add Photo Evidence
Draw on Site Map
Open Tool